Week of |
Lab |
Topic |
|
|
Sept 9 |
1 |
Intro to Safety and Facilities |
|
|
Sept. 16 |
2 |
Group A: |
Group B: |
|
3 |
|
||
|
Sept. 17-18 |
|
Catch-up lab; must be ready for lab 4
|
|
|
Sept. 19-21 |
|
Batch process: Process Step 5; Furnace Pre-deps: Boron, Phosphorus
|
|
|
Sept. 23 |
4 |
|
|
|
Sept. 24-25 |
|
Catch up lab; must be ready for lab 5
|
|
|
Sept. 26-Sept. 29 |
|
Batch process: Process Step 7a; Drive-in
|
|
|
Sept. 30 |
5 |
Group A: |
Group B: 2nd PR: gate mask; etching |
|
Oct. 7 |
6 |
2nd PR: gate mask; etching |
oxide thickness; etch; 4-pt probe |
|
Oct. 8-9 |
|
Catch up lab: must be ready for lab 7
|
|
|
Oct. 10-12 |
|
Batch process: Process Step 11; Gate-ox |
|
|
Oct. 24 |
|
LAB REPORT I DUE Friday Oct. 24 IN LECTURE! |
|
|
Oct. 14 |
7 |
Group A: oxide thickness; junction depth |
Group B: 3rd PR: contact windows |
|
Oct. 21 |
8 |
3rd PR: contact windows |
oxide thickness; junction depth |
|
Oct. 28 |
9 |
etch windows; front side evap.; 4th PR
|
|
|
Nov. 4 |
10 |
front side Al evap., 4th PR cont.; Al etch; backside Al evaporation |
|
|
Nov. 11 |
11 |
4th PR, Al etch cont., backside evap cont.; Al anneals
|
|
|
Nov. 12-13 |
|
Catch up lab: must have device fab complete
|
|
|
Nov. 17 |
|
LAB REPORT II DUE Friday Nov. 21 IN LECTURE!! |
|
|
Nov. 18 |
12 |
Electrical Testing: YOU ARE ONLY RESPONSIBLE FOR PERFORMING THE MEASUREMENTS IN THE TROUBLE SHOOTING PROCEDURE |
|
|
Nov. 25 |
13 |
Electrical Testing |
|
|
Dec. 2 |
14 |
Electrical Testing |
|
|
Dec. 5 |
|
FINAL LAB REPORT III DUE FRIDAY |
|
CLASSES END Fri. Dec. 5
REPORTS DUE: Oct. 24: Lab Report I, Process and results to date: measurements
Nov. 21: Lab Report II, Complete process summary: calculations
Dec. 5: Lab Report III, Final test results: electrical testing